The building faced the Olympic Stadium and was used for all the swimming and diving events. The building stands 45m high and has a footprint of 160m x 80m.
PERI UP Shoring and working scaffold supports the customized individual 3-D units for the curved end walls of the Aquatics Centre, London
The complex geometries and doubled-curved surfaces walls required the design, planning, precision manufacturing and delivery of more than 200 3-D, specialist formwork unitsI using phenolic plywood
Designed by Zaha Hadid shows the bold contours and extraordinary architectural concrete surfaces
Bold designs and extraordinary architectural concrete fulfilled. In addition, the utmost accuracy was required for the subsequent glazing work
PERI UP Shoring and working scaffold supports the customized individual 3-D units for the curved end walls of the Aquatics Centre, London
The complex geometries and doubled-curved surfaces walls required the design, planning, precision manufacturing and delivery of more than 200 3-D, specialist formwork unitsI using phenolic plywood
Designed by Zaha Hadid shows the bold contours and extraordinary architectural concrete surfaces
Bold designs and extraordinary architectural concrete fulfilled. In addition, the utmost accuracy was required for the subsequent glazing work
Project Information
"PERI was able to provide a high level of expertise and knowledge throughout the project."