South Quay Plaza

Multistorey

Using high-quality systems makes all the difference when building structures that are meant to stand out from the rest. We offer climbing, forming, transporting and protection systems to make construction faster, safer and more efficient.

Our Projects

Metal cage with bars and wires inside, with metal mesh stop ends seen on a construction site.
PERI finds the right solution for the One Tower Bridge, London construction
Greenwich Peninsula
RCS supported the spider boom platform to facilitate concrete placement on the core
Brunel Building, North Wharf Road
Section of the Stafford Multi-Storey pre-cast car park with PROKIT edge protection
MULTIPROP with SKYDECK for slab formwork from PERI
PERI's climbing protection panel conforms with Health & Safety Fall from Height Regulations
One Park Drive, Wood Wharf
Steel reinforcement ties the core together
PERI CB Climbing System
TRIO Wall Formwork
SKYDECK Slab System
Delivering an architectural concrete finish for a 19th century building.
PERI ACS (Automatic Climbing System), deployed with RCS (Rail Climbing System) with VARIO. Shows the very high concrete finish below climbing systems on the North Core.
South Quay Plaza