CB Climbing Formwork in action
-
Large scaffold units
with simultaneous high load assumptions through the high loading capacity of the brackets.
Project: Oval Village
-
Time-saving moving procedure
of the securely assembled units consisting of platform and formwork in only one crane lift.
Project: Newington 87 Causeway
-
Free of tripping hazards
in front of and behind the formwork as the platform lining is placed over the brackets (valid for CB 240).
Project: Cardiff University
Variations
CB 240 Climbing Formwork
Bracket width 2.40 m with carriage (75 cm retraction distance), strongback and an adjustable brace
CB 160 Climbing Formwork
Bracket width 1.60 m with adjusting unit, strongback and adjustable brace