The permanent stop end system for the installation of construction joints.

BECOSTOP

Permanent stop-end system for the installation of construction joints.

BECOSTOP is designed and manufactured in Germany, using the highest quality materials to give contractors and specifiers a cost effecting and time-saving solution.

BECOSTOP is key profiled according to the EC2 and can eliminate the need to install couplers into the structure by providing full reinforcement continuity. Furthermore, BECOSTOP can be incorporated with Waterstop solutions integral to the unit, or have facilities designed into the unit to allow for easy installation of any specified waterproofing system. BECOSTOP is a truly bespoke cost and labour-saving solution for modern construction projects when forming day joints for all slab depths.

Advantages:

  • Fast and easy installation
  • Ready to install from pallet
  • Self-supporting up to 1500mm
  • Up to 50% reduction in pour pressure
  • No extra surface preparation needed
  • Designed bespoke for project

BECOSTOP in action

  • Construction workers in high-visibility jackets inspecting construction joints in a large rebar structure at a building site.
    Fast and easy installation

    BECOSTOP arrives ready to install straight from the pallet and no extra surface preparation is required.

BECOSTOP products

Scroll through the standard units below.

Downloads

See our brochures below

Projects

Interested in using BECOSTOP for your next project?

Call us on 01788 861600 to discuss your requirements further.

Submit a form