Alimak STS 300 in action
-
Watch the video to find out more
-
Quick and simple installationWith no time needed to install landing gates, coupled with a single bolt connection of the mast and straightforward tie-in with standard PERI ledgers, the Alimak STS 300 is installed in minimal time. Only standard scaffold tools are required for assembly.
-
Quick and simple installation
With no time needed for the installation of landings gates, coupled with a single bolt connection of the mast and straight forward tie-in with standard PERI ledgers, the Alimak STS 300 is installed in minimal time. Only standard scaffold tools are required for assembly.
-
Enhanced productivity & return on investment
Efficiently and safely install up to 300 m2 of scaffold per day with a crew of just two scaffolders. Due to costs saved on labour, the Alimak STS 300 provides for a prompt return on investment.
-
Designed for safety
With many safety components, the system offers an enhanced way to work more safely. The combination of PERI UP scaffold and Alimak STS 300 ensures scaffolders are always working in a safe position, in line with the latest regulations.
Product Data Sheet
Technical Specifications
Scaffold type
Transportation system
Load
Maximum load capacity: 300kg